If youโre planning a custom home on Vancouver Island, hereโs the short answer: the BC Building Code sets the minimum rules for safety, energy, and durability, and your city or regional inspectors enforce them at each stage before you get occupancy. We plan your build to the correct Step Code target, coordinate permits, schedule inspections, and keep you on schedule with a fixedโprice contract and a detailed build plan. The current code (BCBC 2024) applies to permit applications made on or after March 8, 2024.
What The BC Building Code Means For A Custom Home
The BC Building Code (BCBC) is the provincial regulation that governs how homes are designed and built in B.C. For your project, itโs the rulebook your drawings and site work must meet to get a permit and, ultimately, occupancy. The 2024 edition applies to permits submitted on or after March 8, 2024.
In practice, the code shapes hundreds of design and construction decisions. It doesnโt exist to make your home fancy. It exists to make your home safe, durable, efficient, and healthy. Thatโs why plan checks and inspections revolve around it.
Because codes evolve, we design to the current standard and confirm any local bylaw overlays up front. This avoids midโproject corrections that cost time and money.
Who Enforces It Locally
Municipal building officials enforce the code through permits and inspections. In Nanaimo, for example, the Building Inspections section is responsible for BCBC enforcement and inspection scheduling.
Elsewhere on the midโIsland, the Regional District of Nanaimo (RDN) handles building permits and inspection requests through its online portal and publishes inspection expectations. Different jurisdictions have slightly different admin processes, but the sequence is similar.
Bottom line: you design to BCBC, submit a complete package, build to the approved plans, and pass each checkpoint before moving on.
Part 9 Homes, In Plain English
Most detached custom homes fall under โPart 9โ of the code, which covers small residential buildings. Part 9 is designed for houses and small buildings where prescriptive methods apply, with engineered input as required.
The practical upside is predictability. With a wellโscoped design package and a builder who knows the checkpoints, you avoid openโended engineering exercises and keep the schedule tight.
If your project introduces complexity (steep slopes, unusual spans, retaining structures), we bring in structural or geotechnical engineers early so permitting stays smooth.
The Code Items That Shape Design And Budget

Structure And Site
Your site and structure choices drive foundational decisions: footings, frost protection, seismic holdโdowns, and framing details. On sloped lots or filled sites, geotechnical input may be required to set bearing and drainage strategies.
Good design documents these choices clearly so thereโs no guessing on site. We coordinate engineering letters and truss packages when needed and build them into your schedule.
Budget signal: structure isnโt usually where projects blow up; late changes are. Lock decisions early and stick to the plan.
Energy And Airtightness (Step Code)
BCโs Energy Step Code sets performance targets for energy efficiency and airtightness. It affects insulation levels, window performance, mechanical systems, and blowerโdoor testing. Itโs performanceโbased: you meet the target outcomes, not a fixed list of materials.
Two things matter: your jurisdictionโs required Step at the time of permit, and your comfort/performance goals. We align both in design, coordinate the energy model with a certified energy advisor, and schedule midโconstruction testing to verify youโre on track.
Budget signal: Step requirements can drive higherโperforming assemblies and HVAC. Plan for them early and youโll get better comfort without midโproject surprises.
Life Safety
BCBC governs stair geometry, guard and handrail heights, smoke and CO alarms, egress windows, fire separations, and more. These details seem small until the inspector is on site.
We review lifeโsafety checkpoints at design and run builderโled preโinspections before booking municipal inspections. That reduces reโinspection risk and schedule slip.
Budget signal: most lifeโsafety items are low or medium cost, but reโwork is expensive. Firstโtime right wins.
Building Envelope & Rain Management
On the Island, rain management is everything. The code sets requirements for weatherโresistive barriers, flashings, drainage, and air/vapour control.
We prioritize simple, durable envelope details over exotic assemblies. When the weather turns, youโll be glad you did.
QuickโReference Table
| Code Area | Key Design Decisions | Typical Cost Impact |
| Energy (Step Code) | Insulation levels, window performance, HRV/ERV type | MedโHigh |
| Structure | Foundation specs, framing layout, truss or shear wall design | Med |
| Life Safety | Stair geometry, guardrail design, alarm placement | LowโMed |
| Envelope | Weather barrier, flashing, rain screen detailing | Med |
| Plumbing | Fixture layout, backflow prevention, cleanouts | LowโMed |
Use this to see where design choices ripple into cost. Then decide once, on paper, not twice on site.
Permits, Plan Check, And Inspections: The Sequence That Keeps You On Schedule

PreโDesign Feasibility
We start with zoning, setbacks, servicing, and Step Code target. If covenants, DPs, or slopes are in play, we flag them early so drawings and budgets reflect reality.
Feasibility also covers build logistics: access, staging, and weather windows. Those practical details keep the critical path clear during construction.
The goal is a zeroโdrama permit submission that sets a clean line to occupancy.
Building Permit Submission
A โcompleteโ package typically includes codeโcompliant drawings, site plan and grades, energy model inputs, and any required engineering letters. Jurisdictions may have their own checklists. We match their format and naming to avoid backโandโforth.
Our role is to coordinate designers, engineers, and the energy advisor so the submission is tight. That reduces comments and keeps your place in the queue.
Remember: code compliance is binary at this stage. Either it meets the requirement or it doesnโt. Clear drawings win.
Required Inspections For A Part 9 Home
Expect checkpoints at footings, foundation, underโslab, framing/roughโins, insulation/airโbarrier, and final/occupancy. Local authorities publish their inspection expectations and booking rules. The RDN publishes a schedule of inspections, and Nanaimo outlines booking cutoffs for nextโday inspections.
We prepare for each inspection with checklists, markedโup photos in your client portal, and a builder walkโthrough. When inspectors arrive, the work is ready.
Keep in mind that appointment windows are typically broad. Plan crews accordingly so youโre productive while you wait.
Hereโs The Catch
Inspections confirm minimum compliance, not craftsmanship. Passing doesnโt guarantee longโterm performance if the details are weak.
We aim higher than minimums where it matters: envelope details, air sealing, drainage, and mechanical commissioning. Thatโs how you protect your investment.
Schedule risk mostly comes from incomplete work at inspection time. Our preโinspection routine is designed to prevent that.
Roles And Responsibilities (So Nothing Falls Through The Cracks)
Homeowner
Make timely design decisions, review approvals in the client portal, and keep financing and insurance current. When you decide quickly, we keep trades moving.
Transparent communication beats scope creep. If you want to upgrade, weโll price it clearly before work starts.
Designer/Architect
Prepare codeโcompliant drawings and respond to planโcheck comments. Flag unique conditions early so engineering is coordinated, not rushed at the end.
We work best as one team: designer, engineers, energy advisor, and builder aligned on scope and sequence.
Energy Advisor
Model the home to your Step target, run blowerโdoor testing midโbuild and at completion, and issue compliance documentation. Performance is verified, not assumed.
We bring the advisor in during design so mechanical choices, window specs, and insulation strategies work together.
Engineers (As Needed)
Structural for shear, spans, and holdโdowns; truss engineering; and geotechnical for slopes or fill. Their letters support the permit and inspections. When engaged early, they keep the build straightforward.
Our role is to line up the right expertise at the right time so you donโt pay for hurryโup fees.
Builder (Us)
We coordinate the permit, schedule inspections, manage quality, and maintain safety and documentation on site. You see progress photos, daily logs, and inspection results in your portal.
Our fixedโprice contract model and detailed schedule keep expectations clear. When everyone knows the plan, the plan works.
How Southpaw Homes Keeps Your Build Compliant And Moving
FixedโPrice Contract Model
We set the Step target, scope, and finishes before we break ground. Your contract reflects the full build, not a guess. That control reduces change orders and protects your budget.
Fixed price doesnโt mean inflexible. When you want to change, we price it clearly and confirm the impact on schedule before proceeding.
Detailed Build Schedule With Inspection Checkpoints
We map critical inspections and dependencies into the schedule. Structural inspections drive framing; airtightness checks drive insulation and drywall; final inspections align with occupancy.
Youโll see the plan, the dependencies, and the date windows. The aim is predictable progress.
Client Portal, Daily Logs, And Progress Photos
You have 24/7 access to daily logs, photos, approvals, and inspection results. It keeps decisions moving and prevents miscommunication.
Documentation also protects you at resale. Buyers appreciate a wellโdocumented build.
Credentials That Actually Protect You
- BC Housing Licensed Residential Builder
- Pacific Home Warranty (2โ5โ10 new home warranty)
- WorkSafeBC coverage and $5M commercial liability insurance
- Member, CHBAโVI
- Energy Step Code compliant practices baked into every custom build
These arenโt logos in a footer. Theyโre the framework that keeps your project safe, insured, and warrantied.
FAQs
Is The 2024 BC Building Code In Effect For My Project?
If your building permit application is made on or after March 8, 2024, the 2024 BCBC applies. Some provisions had transition periods, but the effective date for permits is clear. Always confirm local requirements at submission.
Who Checks That My Custom Home Meets Code?
Your local building inspections department reviews the plans, issues the permit, and inspects key stages of work before granting occupancy. In Nanaimo, Building Inspections provides enforcement and booking guidance.
What Is The BC Energy Step Code And Why Does It Matter?
Itโs a performanceโbased framework that sets energyโefficiency and airtightness targets. It influences insulation, window specs, HVAC, and testing. Your required Step depends on permit timing and location.
What Inspections Should I Expect During Construction?
Typically: footings, foundation, underโslab, framing and roughโins, insulation/air barrier, and final/occupancy. The RDN publishes inspection expectations and booking details.
Will Engineering Letters Replace Inspections?
No. Engineering supports compliance, but municipal inspections are still required for each stage before occupancy.
Can Code Requirements Change My Budget MidโProject?
They can if the Step target or key details arenโt set early. We lock scope with a fixedโprice contract and design to the target from day one to avoid midโbuild changes.
How Do You Document Compliance?
Through permit records, inspection signโoffs, energy reports, and photo logs in your client portal. That documentation supports warranty and resale.
Do Renovations Follow The Same Rules?
Renovations and additions must also meet applicable BCBC sections. If youโre expanding, read our guidance for additions and plan for permit and inspection milestones.
Looking for a build partner who handles compliance without drama?
See how we deliver designโbuild custom homes. Weโre a BC Housing Licensed Residential Builder with Pacific Home Warranty (2โ5โ10), WorkSafeBC coverage, and $5M commercial liability insurance. You get 24/7 access to your client portal with daily logs and progress photos. We aim for transparency, not surprises. If you’re ready to take the first step, book a consultation today.