Inside the city limits, Courtenay’s zero carbon step code now requires a new house to run its space heating and its hot water on a low-carbon energy source, and for building permit applications received on or after 1 January 2028 it reaches cooking and laundry as well. A Courtenay mailing address does not tell you which building department has your file. The City has the file inside its boundary, and the Comox Valley Regional District has it in the electoral areas beyond, a level behind the City on its own dates. So the date that decides which rules your house is built to is the day your building permit application is received. Confirming which authority has the file, and which level and step apply there, is the first thing we settle as a custom home builder in Courtenay, before anyone draws a line.
Who Approves Your Build Decides Which Rules Apply

The province publishes the levels and sets a floor that is measurement only, and our guide to the energy step code covers how the steps and the modelling work. Local governments can require any level of the code inside their own boundary, and they set the start dates. So what this requires of your house is never a provincial answer. It is a question about one lot.
What the City of Courtenay Requires Inside the City Limits
Courtenay council adopted the amendment that put the carbon level into the City’s building bylaw on 1 October 2025, so this is adopted law and not a proposal. Inside the city limits, a house falls under the part of the building code written for houses and small buildings, and it has to meet EL-3 for building permit applications received on or after 1 January 2026, and EL-4 for applications received on or after 1 January 2028. The requirement covers the large buildings in the bylaw and the small ones alike, so there is no size of house that designs its way out of it.
Building Services takes the application. Courtenay’s zero carbon step code page names the four parts of a project the requirement can affect: the mechanical systems, the energy model, the envelope design and the documentation.
What the Comox Valley Regional District Requires Beyond the City Limits
Beyond the city boundary, the building permit comes from the Comox Valley Regional District, and its schedule sits a level behind the City’s on its own dates: EL-2 for applications received on or after 1 June 2026, and EL-3 for applications received on or after 1 January 2027. Most of the rural land around Courtenay sits in Electoral Area C, Puntledge Black Creek.
The regional district’s building code page puts EL-3 in plain terms: for applications received on or after 1 January 2027, new construction has to electrify both space heating and hot water. The regional district has adopted levels up to EL-3, and no EL-4 requirement applies in the electoral areas, so there is no 2028 event to plan around out there.
How to Find Out Which One Has Your Lot
A Courtenay mailing address does not settle who approves the build. The City issues permits inside its boundary; the Comox Valley Regional District issues them in the electoral areas beyond it, and the two sit at different carbon levels on different dates. So the first call on a new lot is to the department that will take the application, and we make it before anyone draws anything. A neighbour’s permit is not an answer either: it may have gone in under a different authority, a different level, or a different date.
| City of Courtenay | Comox Valley Regional District electoral areas | |
| Carbon level now | EL-3 | EL-2 |
| Carbon level next, and from when | EL-4, for applications received on or after 1 January 2028 | EL-3, for applications received on or after 1 January 2027 |
| What the current level covers | Space heating and hot water | Space heating, including backup heat |
| Energy step for a house | Step 4 | Step 3 |
| Who takes the application | City Building Services | Regional district Building Services |
The Date That Counts Is the Day Your Application Is Received

Both schedules key off one date, and it is not the date the house is designed or the date it is finished. A design that is compliant in December can be non-compliant in January, and the fix is almost never cosmetic. If your file is already in, the received date has already done its work: an application the building department has accepted as complete keeps the level it went in under.
Why “Ready to Submit” Is Not the Same as “In”
An application is only in under the earlier level once the building department has it and accepts it as complete. So a package that goes over the counter on the last business day of December with one item missing is not a package that beat the date.
In planning terms that means the drawings, the engineering and the energy advisor’s report all have to be finished enough to be accepted together, because the date that governs is the one the department accepts the file as complete, not the one on the courier slip. The projects that come through it well are the ones that treat November as the deadline rather than December.
Timing a 2027 Build Against the Next Change of Level
Inside the city limits, an application received in 2027 is an EL-3 application, and an application received on or after 1 January 2028 is an EL-4 one. A house designed through 2027 therefore has a real decision in front of it about which side of that line it lands on, and the decision gets made at design, because by submission it is already spent.
In the electoral areas the equivalent line has already moved once, for applications received on or after 1 June 2026, and it moves again for applications received on or after 1 January 2027. Either way, the submission date is the thing to work backwards from, and the drawings follow from it rather than the other way round.
Heating and Hot Water Under Courtenay’s Zero Carbon Step Code

The province’s four emission levels climb in a fixed order, and each one adds equipment that has to run on a low-carbon energy source. The provincial base is measurement only, which is why a local level is where the real requirement comes from. Today the City requires the third of those four levels, and the electoral areas sit one level below the City.
Space Heating and Hot Water Are One Decision, Not Two
At the level the City requires today, both the space heating system, including any supplemental heat, and the water heating system have to run on a low-carbon energy source. Cooking and laundry are not caught until the top level. The bar for what counts as low-carbon is set low enough that electricity is the only practical fuel that clears it, which in a house means an air source heat pump plus either a heat pump water heater or an electric tank.
Those two are one decision, not two: they share the electrical service, they share the mechanical room, and both of them need somewhere to go on the drawings. An unusual design that cannot follow the equipment list can still be shown to comply on the numbers instead.
What That Does to the Mechanical Room and the Site Plan
The mechanical room is the first thing to move. A heat pump water heater needs air volume around it, so a closet that worked for a gas tank often does not work for its replacement. The outdoor unit needs a location too, and the good ones are not under a bedroom window and not where the setback puts it.
The gas line that used to serve a furnace, a tank and a range may now serve one appliance or none, which changes the site servicing plan and not just the mechanical drawing. None of this is expensive to solve on a drawing. All of it is expensive to solve on site.
Sizing the Heat Pump Is a Permit-Stage Document
A tighter, better-insulated house needs a smaller heat pump than a rule of thumb would buy. The mechanical sizing calculation that proves it is a real engineering document, and building officials are told to require it at permit application rather than leave it to the mechanical contractor to settle later.
Oversizing costs twice, once in the equipment and then every year in how badly it runs: an oversized heat pump short-cycles, heats unevenly and wears out early. So the heat loss calculation belongs beside the drawings, at the same time as the energy advisor’s report, not after the equipment has been ordered.
The Electrical Service Is the Part Nobody Budgets
Replacing a gas furnace and a gas tank with a heat pump and an electric water heater changes the electrical service calculation, and often the panel with it. Sometimes it changes the service drop as well, and on a rural lot that becomes a conversation with the utility rather than a line item on a quote. It also moves the electrical riser and the panel location on the drawings, which is cheap in design and awkward once the walls are framed.
It is the item that surprises owners most, because it lands after the mechanical selections are made and reads like an extra rather than part of the same decision. Put it in the budget at design, beside the equipment it comes with.
What Still Runs on Gas Inside the City, and What 2028 Reaches

Owners ask about three appliances, and they are not all treated the same way. Inside the city limits the top level arrives for applications received on or after 1 January 2028, and in the electoral areas there is no equivalent date.
The Gas Range
Through 2027 a gas range is still available inside the city limits, because the level in force covers space heating and hot water rather than appliances. For building permit applications received on or after 1 January 2028, the top level reaches cooking and laundry as well. So if a gas range matters to you, that is a decision to make at design, and the application date is what decides which rules the house is under.
Owners ask about the barbecue in the same breath, and which appliances land inside the emissions calculation for your house is something to confirm in the model rather than to assume from the appliance list.
The Gas Fireplace
A gas fireplace is not a safe assumption to design around. Whether it lands inside or outside the emissions calculation depends on the house, so have the energy advisor confirm it in the model before it goes on the drawings rather than after.
The consequence of getting that backwards is bigger than it looks: a fireplace taken off the drawings late takes a chimney chase with it, along with a wall assembly, a structural opening and sometimes the furniture plan for the whole room. It is a design-stage question with a design-stage answer.
Courtenay’s Energy Step Is Step 4, One Above the Provincial Minimum

The carbon level decides what the equipment burns. The energy step decides how little the house needs in the first place, and it is the energy step that thickens walls and changes the window package. Inside the city limits the City requires a step above the provincial minimum, and that is the requirement most likely to catch a budget built on the provincial floor.
Step 4 Inside the City, Step 3 in the Electoral Areas
Since 1 May 2023 the provincial minimum for a new house has been Step 3, and Step 3 is what applies in the electoral areas. Inside the city limits the floor is Step 4. So a budget built on the provincial number is one step low, and the gap sits in the envelope and the window package rather than in the mechanical system.
Step 4 does not change how the BC Building Code treats a house; it changes how well that house has to perform. The province frames the energy steps as guiding new buildings toward net-zero-energy-ready by 2032, so Step 4 is a rung on that climb rather than a local outlier.
What a Step Above the Minimum Does to Walls, Windows and the Permit Drawings
At this step the house is assessed on how airtight it is, how much energy it uses and how much heat it loses, so three things once specified separately have to agree on paper before the permit. In practice the wall assemblies thicken, which moves jamb details and rough openings and can push a footprint against a setback, and continuous insulation changes how the roof meets the wall and how the slab meets the foundation.
The window package is where a budget built on the provincial minimum comes up short, because the schedule has to be specified to the City’s step rather than chosen on looks and price. Windows are ordered off the permit drawings and carry long lead times, so a schedule that misses the step is a re-order rather than a substitution. A Step 5 rancher we built in Nanaimo sits above what the City requires and shows where the top of the ladder lands.
What Happens If the Province Raises the Base Step
The City’s bylaw also sets a higher step in advance: Step 5 applies to building permit applications received on or after the date the building code adopts Step 4 as its own base. The province has not set a date for the next step up, so the standard your drawings have to meet is the one in force on the day your application is received.
For an owner weighing whether to build above Step 4 by choice, that reframes the question. It stops being a hedge against a date and becomes what it always was: a comfort and operating-cost decision.
Who Produces the Reports, and When Each One Is Due

Compliance gets demonstrated twice: once on paper before anything is built, and once afterwards against what was actually installed. The two authorities collect those at slightly different moments, and the practical question is whose job each one is and what it holds up when it is late.
The Documentation Is the Owner’s Obligation
Under the City’s bylaw the owner has to provide all the materials and documentation the energy step code and the carbon level require, prepared and signed by an energy advisor. Not the builder, and not the designer. The advisor also has to show the building inspector that they are registered to do the work and in good standing.
In practice a builder files the package, but the obligation sits with the owner, which is why the advisor is engaged by the owner’s team and engaged early. A document the owner owes is still a document the schedule depends on.
The City Relies on the Advisor’s Reports for the Energy and Carbon Work
Where an energy advisor provides the reports and the field reviews, the City relies solely on those as its assurance that the energy and carbon work substantially complies. So the advisor’s reports are the compliance record for that part of the build. Nobody at the City is re-checking the window package behind the advisor, because the bylaw makes those reports the City’s assurance on the energy and carbon work.
That is the reason the advisor belongs in the design conversation rather than being handed a finished drawing set and asked to produce the permit paperwork, which is the version of this that goes wrong.
What Goes In With the Application, and What Comes Later
In the City, the report that goes in with the application is the one prepared before anything is built, and the one done against the finished house comes before occupancy. The second report is not a formality. It is written against what was actually installed, so a window or a piece of equipment swapped late without telling the advisor surfaces there.
One call to Courtenay building services settles the two things the package depends on: the current document checklist for both the energy step and the carbon level, and whether a mid-build airtightness test is required on your project, because that test is not required everywhere in the province. Either way the schedule is built around it, because finding a leak while the walls are open is cheap and finding one at occupancy is not.
In the Electoral Areas, Occupancy Waits on the Final Report
In the electoral areas the sequence is spelled out. Every newly built or substantially rebuilt home needs pre-permit energy modelling by a certified energy advisor; the advisor returns mid-construction and again before occupancy to confirm the work matches what was modelled; and the occupancy permit is contingent on the regional district’s building services receiving a compliant final energy advisor report.
That last point is the one to carry into a schedule, because it puts a document between a finished house and the keys. The regional district also says the pre-permit work goes best when the designer and the advisor do it together, as early in design as possible, which is the same thing we tell owners inside the city limits.
Where the Carbon Level Shows Up in Your Budget, and Where the Rebates Do Not

The cost of this requirement is not one line item, and it does not sit in one place. The rebate most homeowners have read about is written for a house that already exists. Both are worth knowing before the equipment gets chosen.
The Five Places the Money Actually Goes
The cost of the carbon level shows up in five places: the heat pump, the hot water equipment, the electrical service that now has to carry both, the envelope details that get the house to the City’s energy step, and the energy advisor’s time. Priced into the design, it is a line item you can see and trade against. Priced at permit, it is a change order.
The ones that are expensive to reverse are the two that touch the envelope and the service, because both are drawn before they are built and both have other things hanging off them. Equipment can be swapped on a Tuesday. A wall assembly cannot.
Why the Heat Pump Rebate You Have Read About Does Not Apply to a New Build
The provincial new-construction rebate program is closed, and projects pre-approved under it stopped being eligible years ago. The program that is still running, and the one most homeowners have seen advertised, is written for existing homes: it requires a year-round primary residence that is at least 12 months old, and it excludes newly built homes under 12 months.
So the heat pump rebate is a retrofit program, and a new build does not qualify for it. Plan the equipment on its own merits: the operating cost, the comfort and the equipment’s life, rather than on an incentive that is not pointed at your project.
How We Plan a Courtenay Build Around the Carbon Level
On a Courtenay build, the order you do things in matters more than any single requirement. We confirm which department takes the application, confirm the level and the energy step in force there, bring the energy advisor into the design conversation instead of the permit conversation, and pick the application date deliberately rather than discovering it.
As a Courtenay custom home builder, Southpaw Homes works from a detailed, meticulously planned build schedule, and that schedule is where the advisor’s reports, the inspection stages and the window lead times get slotted against each other. Our client portal, with daily logs and progress photos, means you see a report land or an inspection pass without phoning anyone. We are a BC Housing Licensed Residential Builder, which is the credential behind the warranty registration that sits on your permit file.
If you have a lot in or around Courtenay and drawings are close, get in touch with our team and tell us where the lot sits.
Frequently Asked Questions
Nearly every question here has two answers, depending on which side of the city boundary the lot sits on. The City and the Comox Valley Regional District are not interchangeable on any of them.
Does Courtenay’s Zero Carbon Step Code Apply to My Lot?
Inside the city limits, yes: the City’s requirement is the one your build answers to. Beyond the boundary, the Comox Valley Regional District’s requirement applies instead, at a lower level on different dates, even where the mailing address says Courtenay. Which side of that line the lot sits on changes both the carbon level and the energy step the drawings are built to, so it is the first thing a design has to settle, before the floor plan and well before the equipment.
Can I Still Have a Gas Range in a New Courtenay Home?
Through 2027, inside the city limits, yes, because the level in force covers space heating and hot water. For building permit applications received on or after 1 January 2028, the top level reaches cooking and laundry as well. In the electoral areas the adopted schedule stops at EL-3, and cooking is only reached at EL-4, so a range is not caught there under what the regional district has adopted. What an all-electric kitchen does to the electrical service is the part owners miss: the range joins the heat pump and the water heater on the same panel, so the service calculation belongs in the design rather than in the appliance order.
What Happens If My Application Goes In Just Before 1 January 2028?
An application is only in under the earlier level once the building department has it and accepts it as complete, so the last few days of December are the worst possible place to put a submission target. Plan the drawings, the engineering and the energy advisor’s report to be ready together, and set a submission date with weeks of room in front of it rather than days. A file that misses by one business day is not a file that needs a small fix; it is a file designed to a level it no longer qualifies for.
Is the 2028 Level Coming to the Electoral Areas Too?
EL-2 is the level in force in the electoral areas now, for building permit applications received on or after 1 June 2026, and EL-3 applies to applications received on or after 1 January 2027. The Comox Valley Regional District has adopted levels up to EL-3, and no EL-4 requirement applies in the electoral areas. So a rural Comox Valley lot has no 2028 event to plan around, and the level to design to is the one in force when the application goes in.
Who Is on the Hook If the Energy Report Is Late?
The owner. The City’s bylaw puts the obligation for the energy and carbon documentation on the owner, and in practice that means the date you are protecting depends on a document somebody else prepares. If the advisor’s report is not finished, the application is not complete, so it is not in under the level you were aiming at. That is why the advisor gets a deadline that sits ahead of the submission date rather than on it, and why we treat that deadline as a milestone in the schedule rather than a reminder.
Does Courtenay Require a Mid-Construction Airtightness Test?
The mid-build test is not required everywhere in the province, and the province leaves that call to the local building department, so the sensible move is to build the schedule to accommodate it either way. In the electoral areas the picture is firmer: the Comox Valley Regional District expects the energy advisor back mid-construction and again before occupancy. Either way the test is a scheduling question rather than a compliance surprise, and it is easier to hold a week open and not need it than to find a week once the drywall is on.
Does This Apply to an Addition or a Major Renovation?
The energy and carbon part of Courtenay’s building bylaw is written around new buildings. For an addition, a major renovation or a detached suite, ask building services which parts of it reach your scope before the drawings are finished, because the answer changes what the design has to achieve rather than how it is finished. On an addition that is the difference between matching the existing walls and rebuilding them, so it is worth knowing in the week the design starts rather than in the week it is priced.